WIND ENERGY

Windmills to Badamsha 2021

CARGO
10 windmills and equipment

DIMENSIONS
48.658 m³ incl. 110 oversized units,
max. large 65,8 m (Blades)

LOADING
Brake (DE), Izmir (TR)

DESTINATION
Badamsha (KZ,) with transhipment in KCOI

SCOPE OF CONTRACT
Survey and project engineering, transit customs, delivery of windmills to Badamsha,
6 river-sea vessels and barges, 110 long extendable and lowbed trailer.

WIND ENERGY

Windmills to Astana 2020

CARGO
13 windmills and equipment

DIMENSIONS
46.800 m³, 126 oversized units,
57 x 4 x 2.8 [m] m (Blades)

LOADING
Vasto/Taranto (IT); Esbjerg (DK)

DESTINATION
Astana, now Nur-Sultan (KZ),
with transshipment in KCOI

SCOPE OF CONTRACT
Survey and project engineering, transit customs, delivery of windmills to Badamsha,
7 river-sea vessels and barges, 126 long extendable and lowbed trailer.

WIND ENERGY

Windmills to Badamsha 2019

CARGO
13 windmills and equipment

DIMENSIONS
52.418 m³ / 5.021 t, incl. 170 oversized units,
max. large 65 m (Blades)

LOADING
Brake (DE), Bandirma & Izmir (TR),
Jiangyin (CN)

DESTINATION
Badamsha (KZ), with transhipment in KCOI

SCOPE OF CONTRACT
Survey and project engineering, transit customs, delivery of windmills to Badamsha,
7 river-sea vessels and barges, 145 long extendable and lowbed trailer.

OIL & GAS

LNG platforms to Sabetta (RU)

CARGO
Volume of 155.000 FT, 4 x LNG platforms
(weight of each 730 MT)

DIMENSIONS
Platform 42 x 25 x 17 m (LWH)

LOADING
Kaliningrad (Russia)

DESTINATION
Sabetta (Russia)

SCOPE OF CONTRACT
Delivery of LNG platforms to Sabetta for Yamal LNG Project.

OIL & GAS

Delivery for the National Space Centre in Astana, Kazakhstan

CARGO
High-tech equipment for the construction of the National Space Centre in Astana (KZ). Diameter of the four biggest components (segments) of the Thermal Vacuum Chamber Systems 9,5 m.

LOADING
Port Liège (Belgium)

DESTINATION
National Space Centre in Astana (Kazakhstan), with transshipment in Port Antwerp, Belgium, Port Archangelsk, Russia, River Port Omsk

SCOPE OF CONTRACT
Transport route from the Inland Port Liège to Antwerp, Belgium, where the cargo was transshipped to an ocean vessel, from where it was shipped to Port Archangelsk, Russia for customs transit und transshipment to an inland-ocean-vessel. The vessel continued its transportation through the North Sea to the Rivers of Ob and Irtysch to the Inland Port Omsk, Russia. The transport from Inland Port Omsk to Astana was delivered by road transportation

OIL & GAS

Gas Turbine Power Plant to Tashkent

CARGO
Power plant equipment incl. gas and steam turbine and 2 turbine generators + 170 units (800 t) equipment

DIMENSIONS
Gas turbine (279 t), gas turbine generator (225 t) + equipment

LOADING
Port Charleston/Albany (US) / Linz (АT)

DESTINATION
Taschkent, with transhipment in Constanta (RO) / Kuryk (KZ)

SCOPE OF CONTRACT
Survey and project engineering, transit customs in Kazakhstan and Uzbekistan, customs clearance. Delivery from port of loading with charter vessels and river-sea vessels to Constanta (RO). Transshipment in Constanta (RO) from river sea vessel to barge. Delivery to port Kuryk (KZ) and unloading. 2300 km land transportation to the site of power plant Tashkent.

OIL & GAS

Refinery delivery to Volgograd (RU)

CARGO
2 reactors 845 MT and 1.116 MT (37 m х 8,5 m х 7,3 m) and column 500 MT (67 m х 7,2 m х 7,5 m) for Lukoil refinery construction in Volgograd. Total weight and volume: 8.039 t, 43.500ft.

LOADING
Italy, UAE, Korea, Spain, India

DESTINATION
RoRo berth near Volgograd (Russia)

SCOPE OF CONTRACT
Route developing using diverse transportation modes, including river-sea vessels, special pontoons and various types of specialized trucks. Customized barge-to-barge transshipment of heavyweight 1116 MT reactor performed for the first time in Russia. Provisional works of infrastructure development for heavy-lift cargo in 6 months before the transportation.